无码av毛片一级不卡|一本综合九九国产二区|AⅤ高清无码免费看大片|国产真实高潮太爽了十八|国内精品久久无码人妻影院|亚洲AV影院一区二区三区|国产精品久久久久久中文麻豆|97精品一区二区视频在线观看

    <source id="wsbxs"></source><track id="wsbxs"><dl id="wsbxs"><delect id="wsbxs"></delect></dl></track>
    1. 下載手機(jī)汽配人

      超前小導(dǎo)管注漿止?jié){方法有哪些?

      問(wèn) 提問(wèn)者:網(wǎng)友 2018-08-11
      最佳回答
      Abstract: Staggered by the length of small pipe leading drilling and grouting support technology, Lion-shaped tunnel Ⅱ rock preinstalled reinforcement, through small pipe hole to loose rock into the cement to the Rock Fracture filling and broken rock glue to form a whole and thus enhance the coherence and rock solid. Thesis describes a small catheter injection process, drilling and grouting equipment, Grouting parameter selection and practical engineering applications. Through the tunnel deformation monitoring and analysis of grouting has achieved very good results. Keywords:Small tube; Tunnel; Surrounding rock reinforcement; Pre-grouting 0Overview With the development of the motorway and railway, an increasing number of tunneling in unstable formations, often with advanced support of the ground pre-reinforcement. Advanced support is generally have the following forms: Advanced large pipe, advanced pre-grouting (comprehensive pre-grouting), ahead of bolt and advance canal, etc.; These consolidation measures,
      回答者:網(wǎng)友
      產(chǎn)品精選
      搜索問(wèn)答
      還沒有汽配人賬號(hào)?立即注冊(cè)

      我要提問(wèn)

      汽配限時(shí)折扣

      本頁(yè)是網(wǎng)友提供的關(guān)于“超前小導(dǎo)管注漿止?jié){方法有哪些?”的解答,僅供您參考,汽配人網(wǎng)不保證該解答的準(zhǔn)確性。